Critical Safety Items
  School Item # Description Complete by 
1 Hapeville 5681 Storage area under corridor stairs needs to be sealed off with fire wall and fire proofing is needed to protect ceiling/floor slabs. Completed
2 Centennial 9011 Upgrade HVAC in existing photo labs. Completed
3 Chattahoochee 9016 Upgrade HVAC in existing photo labs. Completed
4 North Springs  9050 Upgrade HVAC in existing photo labs. Completed
5 Mimosa 14040 Add a handicap rail with curb cut at front entry under the canopy.  Completed
6 Gullatt 4306 Modify toilets in counseling area to provide ADA accessibility.   Completed
7 Hapeville 5668 A dead end corridor on the ground floor exceeds the 20' limit.  Investigate, design, and construct code compliant egress. Completed
8 Tubman  5362 Remove and replace the wooden ramp outside the Band Room with a concrete ramp. Completed
9 Mount Olive 12041 A dead end corridor on the ground floor exceeds the 20' limit.  Investigate, design, and construct code compliant egress. Completed
10 Hapeville 5667 Replace damaged or missing insulation on ADA lavatories. Completed
11 Conley Hills 5290 Fire doors separating original non-sprinklered to sprinklered addition have been removed.  Reinstall missing doors and install hold-open devices tied to fire alarm. Completed
12 Conley Hills 9023 Install reduced pressure assembly with positive drain, feeding kitchen steamers. Completed
13 Roswell North 7433 Replace intercom system. Completed
14 College Park 5207 Install backflow preventors on the domestic and sprinkler incoming mains.  Provide 3 backflow preventors in an exterior vault.  Also include backflow preventor for boiler as outlined in #5223 below. Completed
15 Oak Knoll 5272 Install backflow preventors on domestic water and fire main lines.  Place valves in exterior vault. Completed
16 Mountain Park 7330 H/C lift to stage. Completed
17 Tubman 12062 Provide additional exterior lighting near front entrance to the gym. Completed
18 Oak Knoll 5781 Remove and replace hand rails and guard rails at the ramp to the gym and in the theatre that do not meet code. Completed
19 Seaborn Lee 4493 Replace galvanized water service piping to the building and in the area of the pressure reducing valve as needed.  Further evaluation is needed to determine extent of scope. Completed
20 Conley Hills 5298 Install GFI receptacles in all wet areas. Completed
21 Palmetto 4364 Replace all magnetic hold-open devices on all fire doors. Intial scope of work completed
22 High Point  8119 Extend handicapped rail at ramp by cafeteria.  Add 15' of painted metal pipe straight rail. Intial scope of work completed
23 Hapeville 11010 Cafeteria walk-in cooler unit mildews.  See item #5649 regarding replacement of the cooler freezer prior to addressing this issue.   Completion By March