This project consists of three phases

Overall Site Plan Phase 2

 

Phase One - JROTC Relocation is a Uniform Storage Area consisting of 4,125 Square Feet

JROTC elected to relocate from South Metro Center to an existing automotive area which consists of 4125 Square Feet at the old Westlake High School. In order to prepare for the relocation, the existing automotive area will need to be cleaned, painted, concrete floor sealed and double doors added. Re-keying of the area is necessitated by Army JROTC regulations.

 

Phase Two - Flat Shoals Renovation for South Crossroads -

Program Management was requested to make recommendations on the renovation of the rear portion of the Flat Shoals Center for Crossroads/Second Chance programs. The rear area of Flat Shoals Center was originally designed for larger technical shops with rough finishes. It is currently used for JROTC and building storage. It will require significant up grades as noted: 13- small classrooms will be provided, which will be occupied by 12 to 15 students per classroom, a shared cafeteria, shared gymnasium, media center, computer lab, administration space, new flooring, suspended ceilings with classroom lighting and centralized HVAC. The site will also be modified to provide 18- additional parking spaces and a covered walk path from the existing bus drop-off area in the front of the building to the proposed rear administrative entrance.

.

Flat Shoals Consolidaton South Canopy

 

Phase Three - -Westlake JROTC / Renovation Office Area which consists of 1203 Square Feet

JROTC elected to relocate from South Metro Center to an existing transportation lab which consists of 1203 Square Feet at the old Westlake High School. In order to prepare for the relocation, the existing transportation lab will need to be cleaned, painted, concrete floor sealed and double doors added. Re-keying of the area is necessitated by Army JROTC regulations.

 

.

Flat Shoals Consolidated Phase Three ROTC Office Area